Alton Tucker Blvd Extension. This project’s objective was to improve the intersection of Level Creek Rd and West Broad Street, as well as extend Alton Tucker to Highway 20 at the east end of the E Center property, connecting the downtown to Highway 20. Paving, striping, and signal installation has been completed. A stamped asphalt …
↧